Here is a glimpse of our projects nationally and internationally.
The main concept of construction project management is not only connected to technical parameters like budgeting and execution, but also requires solid communication between the entire team, as it comprises several smaller projects, not a single activity, that require meticulous planning.
Our project managers spend most of the time monitoring performance to stay in control of projects and make sure that everything is on track, which takes construction plans to the next level.
Green Modeling Contracting executed multiple impressive mega projects in the global pharmaceutical and biopharmaceutical sectors. The company delivered innovative solutions to leading pharmaceutical companies such as Pfizer Pharmaceuticals, Merck Sharp and Bristol Myers Squibb.
With the heritage of craftsmanship and commitment for innovation, Green Modeling Contracting strives to add all the projects in Egypt’s Oil & Gas sector to its success story. Our clearly defined strategies, procedures, and standards have played a strategic role in the completion of Esso Gas Stations, in addition to Total Gas Station in Cairo, (Under Construction).
Green Modeling Contracting has developed creative solutions to reduce manufacturing costs, eliminate waste, generate higher volume business results, and deliver more affordable, legacy-quality factories in Egypt such as:
PepsiCo, Inc. and Al-Midani, in addition to Coffee factory in New Cairo, and Marble factory in Maadi.
Green Modeling Contracting uses different approaches for each project to achieve optimal results. We have completed steel
construction projects such as Middle East Mills, Al-Hamd Mills and Al-Hiny Mills.
We are always keen to provide practical solutions that build affordable, healthy, sustainable, safe, efficient, and resilient poultry huts such as: Al Wady Poultry in Cairo, Egypt.
Green Modeling Contracting offers a full scope of construction services and has successfully completed a variety of institutional, industrial, and commercial projects such as El Rehab Shopping Mall.
Green Modeling Contracting works on massive health and care system projects including Manshyet Al-Bakry Hospital, Chest Hospital, Abbassia Psychiatric Hospital, 6TH Of October Bones Hospital, Wadi Al Natroun Correctional & Rehabilitation Complex, and 10th Of Ramadan Hospital. Providing a sustainable environment and high-quality healthcare.
When it comes to hospitality projects, Green Modeling Contracting provides top notch construction and design-build services to create luxury hotels with high-end finishes. This is clearly shown in multiple projects such as the Petroplaza Tower, Mena House Oberoi Hotels, and 8 other residential buildings, as well as the execution of The 33 buildings turnkey project which represents an initiative approach to provide housing for low-income groups.
Details matter when it comes to building efficient and cost-effective warehouses. The completed warehouse project
for PepsiCo, Inc. has been strategically engineered to provide supreme efficiency for the staff and the clients.
Police Equestrian Force HQ:
Green Modeling Contracting has constructed and executed the veterinary hospital that was built on an area of 1050 sqm, along with the execution and finishing of a 550 sqm admin building, 75 horse stables and 5 service buildings that include offices and stores, as well as a residential building for recruiters, a restaurant, and an arbitration building.
Khanka Police Training Facility:
The project consists of 16 multi-purpose buildings, including administrative, residential, training, and maintenance facilities, covering a total area of 38 thousand square meters.
Police Union Sports Club:
Our scope of work included the execution of a recreational hotel for players, a community center, an international complex for games, and a physio-therapy building. The community center, international gymnasium, and physiotherapy building have also been renovated. Moreover, the club’s sewage network was established, the asphalt was paved, and the club’s gates were replaced.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |